Overview of Facts Technologies Project Proposals


The 2023-24 Spending budget

Introduction

This post gives an overview of the information and facts technologies (IT) projects in the Governor’s proposed 2023-24 spending budget. We initial give relevant background information and facts on the California Division of Technologies (CDT) and the phases of an IT project. We then determine each and every of the spending budget proposals to program, create, and implement IT projects. We give our assessment of subjects prevalent to a number of IT project-connected proposals and present solutions for legislative consideration. (We do not give in-depth evaluation of any person spending budget request in the post, but hyperlink to other IT project-connected analyses in other publications organized by spending budget region.)

Background

Part of CDT. CDT is an entity inside the Government Operations Agency with broad authority more than all elements of technologies in state government. This post focuses on two of the department’s responsibilities: (1) to overview and approve IT projects proposed by state entities, and (two) to oversee improvement and implementation of authorized projects till completed.

Phases of an IT Project. A state IT project goes by way of 3 distinct phases: (1) planning, (two) development and implementation (D&ampI), and (three) maintenance and operations (M&ampO). Most state IT projects in the preparing phase (referred to as proposed projects) are essential to total CDT’s Project Approval Lifecycle (PAL)—the state’s IT project approval procedure. Some proposed projects, such as low price and/or low threat projects, are delegated back to entities to program, create, and implement with no direct approval and oversight by CDT. Other proposed projects are determined to be exempt from PAL, for instance, minor upgrades to current IT systems. As soon as authorized by way of PAL (referred to as authorized projects), state IT projects commence D&ampI. As soon as D&ampI is completed, state entities commence M&ampO of the IT technique. We describe each and every phase in much more detail under:

  • Organizing (PAL). The PAL procedure divides state IT project approval into 4 stages: (1) business evaluation, (two) alternatives evaluation, (three) solution evaluation, and (four) project readiness and approval. Each and every stage in the PAL procedure needs entities to submit an connected preparing document to CDT for its approval. Collectively, the preparing documents from the 4 stages give a total project program such as the price, schedule, and scope of the project. Figure 1 gives a graphical depiction of the PAL procedure.
  • D&ampI. As soon as CDT approves a proposed IT project, state entities can commence project D&ampI. Projects can method D&ampI in a number of strategies: (1) the conventional “waterfall” method, (two) the “agile method,” or (three) some mixture of conventional and agile approaches. Employing the conventional method, entities create the complete scope of the project prior to it is implemented. Employing the agile method, by contrast, entities create some of the project scope (occasionally referred to as modules) and implement it although the rest of the scope is becoming created. A mixture of the conventional and agile approaches may create project scope as modules, but combine the modules into a handful of discrete releases for implementation to decrease the frequency of user testing and instruction.
  • M&ampO. As soon as IT project D&ampI is completed, a project becomes an IT technique and enters M&ampO. M&ampO incorporates activities and expenses connected with a state entity’s ongoing upkeep and continuing use of a technique.

Relevant Modifications to IT Project Procurement and Oversight. Two current adjustments to state IT project procurement and oversight are relevant to this post.

  • Challenge-Primarily based Procurements. In January 2019, Governor Newsom signed an executive order (EO N-04-19) directing CDT and the Division of Basic Solutions to create new procurement approaches that defined a difficulty for bidders to resolve and asked them to demonstrate their capacity to resolve it by way of demonstrations, proofs of idea, and prototypes. We commonly refer to these new approaches as challenge-primarily based procurements in the post. The aim of challenge-primarily based procurements is to let much more bidders to present options to the state’s complicated issues, rather than requiring the state to pre-define options with detailed specifications-primarily based solicitations.
  • Enterprise Modernization Efforts. Huge state entities such as the Division of Wellness Care Solutions (DHCS) and the Employment Improvement Division (EDD) are making use of an enterprise project management method (that is, managing a quantity of concurrent and normally connected IT efforts and projects) to modernize their applications and/or solutions. As person IT projects progress by way of unique phases, CDT tries to give oversight not only of the person IT project but also of the complete enterprise portfolio of IT efforts and projects. Important examples of this method are DHCS’ Medi-Cal Enterprise Systems (MES) Modernization and EDD’s EDDNext modernization work.

Governor’s 2023-24 Spending budget

Governor’s IT Project Proposals Total $641 Million ($432 Million Basic Fund) and 275.two Positions. According to CDT and the Division of Finance (DOF), 40 spending budget proposals in the Governor’s 2023-24 spending budget are connected to IT project proposals (Figure 2). These proposals request a total of $641 million ($432 million Basic Fund) and 275.two positions. Some of these proposals include non-IT project-connected funding and/or positions, as we are unable to separate IT project-connected and non-IT project-connected expenses in each and every proposal.

Figure two

Governor’s 2023‑24 Spending budget IT Project Proposalsa

(In Millions)

Entity

Spending budget Modify Proposal Name

2023‑24b

TF

GF

OF

Positions

EDD

EDDNext Modernization

$198.

$99.

$99.

FTB

Enterprise Information to Income Project two

135.

135.

$72.

CDCR

Statewide Correctional Video Surveillance Continuation

87.7

87.7

19.

SWRCB

Water Rights Modernization Continuation

31.five

31.five

DSH

Electronic Wellness Records Organizing

21.five

21.five

40.two

DIR

Electronic Adjudication Management Program Modernization

21.1

21.1

CARB

Heavy‑Duty Automobile Inspection and Upkeep Plan Per SB 210

14.1

14.1

19.

DDS

Uniform Fiscal Program Modernization and the Customer Electronic Records Management Program Project Organizing

12.7

12.7

DIR

Cal/OSHA Information Modernization Project

12.six

12.six

CDCR

eDiscovery Ongoing Demands

ten.

ten.

11.

CHP

Wireless Mobile Video/Audio Recording Program and Body‑Worn Camera Statewide Implementation

9.eight

9.eight

11.

CDCR

BIS Migration to S/four HANA

eight.1

eight.1

DHCS

Medi‑Cal Enterprise Systems Modernization

7.eight

1.four

six.four

7.

CDFA

Emerging Threats Facts Management Program

six.7

four.two

two.five

three.

DCA

Enterprise Modernization Cohort 1 and two

six.

six.

Caltrans

Transportation Program Network Replacement

five.eight

five.eight

11.

CARB

Embodied Carbon Emissions: Building Components (AB 2446)

five.7

five.7

15.

GovOps

Workplace of the Cradle‑to‑Career Information Program Right‑Sizing

four.9

four.9

ten.

CalEPA

California Environmental Reporting Program Project

four.three

four.three

SOS

Notary Automation Plan Replacement Project (NAP two.)

three.six

three.six

two.

CDPH

California Newborn Screening Plan Expansion

three.five

three.five

four.

DPR

California Pesticide Electronic Submission Tracking (CalPEST) Project

three.three

three.three

two.

SOS

Disqualification from Voting (AB 2841)

three.1

three.1

11.

CHHS

Electronic Take a look at Verification Phase II

two.9

.7

two.two

three.

CalVet

CalVet Electronic Wellness Record Project: Added Activities and Scope Improve

two.five

two.five

DGS

Procurement Division E‑Marketplace Implementation

two.four

two.four

two.

CalRecycle

CalRecycle Integrated Facts Program

two.three

two.three

four.

CARB

SB 1137 Implementation: Wellness Protection Zones

two.two

two.two

9.

OEHHA

Building a Statewide Intense Heat Ranking Program (AB 2238)

two.two

two.two

four.

CDFA

Stage Gate two Planning—CDFA Licensing and Payment Portal

1.five

1.five

SOS

Public Entity Workers and Contractors Access to Protected at House (SB 1131)

1.five

1.five

six.

CalHR

Communications Workplace and Content material Management Program Replacement

1.four

1.

.four

two.

CHHS

California Emergency Health-related Solutions Information Resource Program

1.1

1.1

six.

CalVet

Web-site Improvement to Boost Digital Communications

1.

1.

DSS

Reinforce the Caregiver Background Verify Program and the Background Verify Sources

.9

.9

DIR

Workers’ Compensation Facts Program Upgrade

.eight

.eight

CDFA

IT Enterprise Transition Help

.five

.five

Caltrans

Enterprise Information Governance Technologies Option Stage four

.four

.four

OPR

Programmer Position to Preserve and Redesign the CEQA Program

.three

.three

1.

CalEPA

CalEPA Geographic Facts Officer

.three

.three

1.

Totals

$641.

$432.

$208.9

$275.two

IT Project-Particular Perform Goods

We do not give in-depth evaluation of any person spending budget request in this post, but we have covered the California Division of Corrections and Rehabilitation (CDCR) BIS Migration to S/four HANA project in a prior publication The 2023-24 Spending budget: The California Division of Corrections and Rehabilitation—Migration of Enterprise Facts Program to Updated Computer software Platform (two/16/2023).

Assessment

Enhanced Use of Challenge-Primarily based Procurements With out Evaluation. A quantity of the IT project proposals in the Governor’s 2023-24 spending budget made use of challenge-primarily based procurements (such as the State Water Sources Handle Board’s Water Rights Modernization Continuation proposal) or are preparing to use stated procurements. Some procurements may perhaps demand upfront funding from the state for demonstrations, proofs of idea, and prototypes (such as the Division of Meals and Agriculture’s Emerging Threats Facts Management Program proposal). Nonetheless, we have observed no evaluation performed by the administration of challenge-primarily based procurements to ascertain whether or not, for instance, extra preparing expenses for these demonstrations, proofs of idea, and prototypes led to enhanced project D&ampI outcomes.

Huge Enterprise Modernization Efforts Make Legislative Oversight Extra Difficult. Two IT project proposals in the Governor’s 2023-24 budget—DHCS’s MES Modernization proposal and EDD’s EDDNext Modernization proposal—are enterprise modernization efforts that include a quantity of IT projects in unique phases of PAL, D&ampI, and M&ampO. For each of the efforts, the Legislature authorized quarterly reporting specifications and, for MES Modernization, CDT began portfolio-level independent project oversight reports to track IT efforts and projects that are portion of the bigger modernization work. In each circumstances, we discover these oversight tools to be insufficient to monitor complicated and pricey modernization efforts with substantial programmatic effects. For instance, although person efforts and projects are tracked inside the portfolio, what efforts or projects are most essential to the achievement of the modernization work and/or pose the most threat if they are not effective normally is unclear. Also, programmatic effects are not normally evident, as person efforts and projects may be focused on modernization of technical functions inside IT systems (such as claims processing or drawing down federal funds) rather than particular applications and/or solutions. Figuring out how a great deal a complicated, substantial modernization work will price and more than what time frame also is hard for the Legislature to oversee as the scope of the work is not normally recognized at the outset.

Projects Increasingly Use Combined Agile and Conventional D&ampI Approaches With Mixed Final results. We discover that much more IT project management employees are familiar with the agile method to project D&ampI. We also discover that much more projects acknowledge the realities each of the annual legislative spending budget procedure and of state entities’ continued programmatic responsibilities that necessitate some components of the conventional method to project D&ampI. Combinations of agile and conventional approaches to project D&ampI, thus, are becoming much more prevalent. For instance, for the Division of Social Services’ Kid Welfare Solutions – California Automated Response and Engagement Program project, the project D&ampI method changed to a mixture of agile and conventional approaches since county eligibility workers necessary to limit the quantity of user testing and instruction essential. Discrete releases of new functionalities, rather than continuous implementation of new functionalities, permits workers to continue to concentrate on their key workload. Nonetheless, we discover that new oversight tools from CDT for agile or combined agile and conventional projects are insufficient. For instance, CDT introduced an annual iterative project report (IPR) for authorized IT projects making use of an agile or combined agile and conventional method to let, for instance, reprioritization of modules with no a Particular Project Report (SPR). (An SPR is a report essential for projects that deviate from their baseline price, schedule, and scope by around 10 percent.) Nonetheless, the IPR as introduced may perhaps compromise legislative oversight if the project price, schedule, and scope adjust on an annual basis with no clear measures of achievement.

Choices for Legislative Consideration

Direct CDT and DOF to Lead Evaluation of Challenge-Primarily based Procurement Modifications. We suggest the Legislature adopt supplemental report language (SRL) that directs each CDT and DOF to evaluate, at a minimum, whether or not extra preparing expenses requested by state entities for challenge-primarily based procurements have led to enhanced project D&ampI outcomes. DOF could use quarterly project preparing expenditure reports for proposed IT projects to inform their evaluation. We also suggest the Legislature request this report no later than April 1, 2024 to inform the 2024-25 spending budget procedure.

Direct CDT and DOF to Perform With Legislature on Oversight of Enterprise Modernization Efforts and Projects Employing Agile Method. We suggest the Legislature adopt SRL that directs CDT and DOF to function with legislative employees on solutions to increase oversight of enterprise modernization efforts and projects making use of an agile method or combined agile and conventional approaches to project D&ampI. The report could look at, for instance, whether or not new standardized reports for these efforts and projects, each to CDT and the Legislature, are warranted. The report also could look at whether or not adjustments in CDT’s PAL procedure are necessary to regularly program these efforts and projects. We also suggest the Legislature request this report no later than April 1, 2024 to inform the 2024-25 spending budget procedure.

Leave a Reply

Previous post Bay Region enterprises nevertheless in survival mode
Next post Village of Mount Prospect, IL